Stone’s Throw II

About This Project
Status
    • Completed, 2020
Address
    • 325-345 W Pacific, Telluride
Team
About
    • 3 residences
    • 5 bed/5.5 bath; 3 bed/3.5 bath; 4 bed/4.5 bath
    • 4,741 SF; 2,992 SF; 3,780 SF
    • Ground-up new builds
    • Brand new construction; views; one block from main street; one block from the gondola
    • Value Creation: maximizing gross living area with 4-floor residences